Completing a full exterior upgrade on a house is a major undertaking that can enhance its entire appearance and functionality. Whether you are a homeowner looking to do a full remodel, a builder managing a project, or a contractor executing the work, knowing the steps to follow and what challenges to expect will ensure that the upgrade is made on schedule and to proper standards. 

Completing a full upgrade on the exterior of a house usually has a few core elements. These are the installation of a new roof, installation of a deck, replacement of all house windows, and replacement of all exterior doors. These updates together make the house more appealing and noticeable, more energy efficient, and even increase the value of the house. 

Let’s dive a little deeper so that we can best outline what to expect for a full exterior upgrade on a home. 

1. Initial Assessment and Consultation 

This exterior work must begin with the fundamental checklist, which assesses the home’s exterior. Most homeowners will contact a roofer, deck builder, or window and door specialists for these residential exterior services. 

For the consultation that the homeowners will attend, we recommend that this be done with builders and contractors, as they understand what is most critical and the most efficient to work on first. 

During the consultation, several crucial steps must be taken: 

  • Complete a walkthrough to check the condition of the exterior elements that are in place. 
  • Confirm preferences for the architectural design and price range. 
  • Documenting by taking pictures, as well as their respective measurements. 
  • Review the materials and their timeline.

2. Budgeting and Project Scope  

After the assessments have been performed, specialists give itemized estimates along with a project timeline.  A budget, both time and money, should be planned realistically. For example,  

Roof construction: Materials (asphalt, metal, tile, etc.), square footage, and the complexity of the roof structure.  

Deck construction: Material used (wood, composite, PVC), square footage, height, and the design of the railings.  

Home window replacement: Number of windows, energy efficiency ratings, and bespoke sizes.  

Exterior door installation: Types of doors (entry, sliding, French), insulation, and security.  

Finishing touches: Most residential exterior services providers will manage the order of work based on structural necessities and available budget.  

3. Permits and Scheduling

Before work begins, the necessary building permits must be secured, especially for structural modifications like decks or roof replacements.

Contractors typically handle this process, but homeowners should confirm:

  • What permits are required in their jurisdiction?

  • The expected timeline for approvals.

  • Any restrictions related to historic homes or HOA regulations.

Once permits are obtained, the project is scheduled. Work is often staggered to reduce disruption and manage site logistics. For example, the roof installation is usually done before home window replacement to prevent debris damage to new windows.

4. Roof Installation

A brand-new roof is one of the largest components of any full exterior upgrade. Installing a new roof increases insulation, curb appeal, and prevents water from entering the home.  

Expect the following:  

  • Removal of existing roofing materials.  
  • Repair or inspection of the roof deck.  
  • Installation of flashing and underlayment.  
  • Installation of new roofing materials.  
  • Disposal of old materials and cleaning the site.  

During this phase, homeowners should expect noise, dust, and limited access to certain areas of the house.  

5. Window and Door Replacement  

Indoor comfort levels and the energy efficiency of a home usually improve with new doors and windows. Replacing doors and windows also boosts the home’s aesthetics.  

A home window replacement includes:  

  • Removal of the old frames and sashes.  
  • Address moisture, seal any openings, and prevent rot.  
  • The installation of windows that are energy-efficient.  
  • Insulation and trimming for a clean finish.  

Installing exterior doors involves:  

  • Removal of the existing doors.  
  • Installation of new unit frames and thresholds.  
  • Weather-stripping and hardware installation.  
  • Sealing the opening for enhanced security, energy efficiency, and exposure to the elements.  

Installations for each window and door are typically finished in one day, depending on the complexity and number of openings.

6. Deck Installation

Creating or replacing an outdoor deck increases a home’s usable area and can improve its value. Decks are also one of the more customizable elements of a home’s exterior.

A deck is usually installed with the following steps:

  • Laying out the predefined area and material selection.
  • Excavation and establishing the footings.
  • Deck framing and board installation.
  • Installation of the deck railings, steps, and any other additions (lighting, pergolas, built-in seating). 

This phase takes anywhere from a few days to a week, and sometimes longer, depending on the size, materials, and complexity of the project. Coordination with outdoor electricians for lighting or outlet installation can add an additional few days to project completion.

7. Final Touches and Cleanup

Finalizing the smaller details amalgamates with the larger details, bringing together a chic and sophisticated home. This could be:

  • Trim and deck painting or staining.
  • Joint sealing alongside protective caulking application.
  • Shutter and downspout replacements or upgrades.
  • Final landscaping or regrading near the home’s foundation.

Through a residential exterior service, the homeowner can complete a walkthrough for the following:

  • Shutter and downspout replacements or upgrades.
  • Joint sealing alongside protective caulking application.
  • Overall appearance with smooth and clean weather-resistant sealing on all elements.
  • Construction debris disposal.

8. Beyond Projects: Maintenance, Care, and Warranties

After completing the exterior of the house, an owner needs to understand the care and maintenance required to best protect their investment. Professionals usually have warranties for the materials and work done. Homeowners need to do the following:

  • Safeguard documentation of the work done.
  • Set for annual roof and deck inspections.
  • Regularly clean the windows and doors to protect the finishes.
  • Correctly and promptly resolve small issues.

In addition, builders and contractors may give the owners a post-project maintenance checklist to help them address the seasonal work that needs to be done.

Conclusion

Upgrading and renovating the exterior of a house is a huge investment, but a worthy one that enhances the home’s long-term aesthetic appeal, functionality, and value. Homeowners can look forward to centering partners like builders and contractors to have a streamlined understanding of each phase from the initial consultation to the final inspection, so they can guide them through a successful and smooth transformation.

If you need an exterior look-over, you can prioritize a roof replacement, a stylish deck installation, energy-efficient windows for the home, or a strong exterior door. Working with dedicated residential exterior service providers guarantees the home is beautiful and will remain so for years to come.